JBA was appointed to undertake catchment and process based geomorphological and ecological assessments to identify system pressures leading to WFD failure within the Rhymney River. Nature based opportunities were identified at catchment and reach level to scope and prioritise future river restoration. Rebecca was the lead geomorphologist and project manager.
JBA was appointed to undertake a feasibility assessment for floodplain reconnection of a river valley in Exmoor National Park. Rebecca was the project manager and lead geomorphologist. Desk and site based assessments were undertaken, followed by optioneering, hydraulic modelling and, subsequently, detailed design development.
JBA was appointed to develop a river restoration design of a straightened and highly modified urban river. A process-based approach was taken to develop the detailed design, including site walkovers and geomorphic modelling. Rebecca was the lead geomorphologist and project manager and provided on-site geomorphic support during construction in 2022.