Home>Our Work>Project Examples>River Cole Project

River Cole Project

Coleshill Mill, River Cole: Management assessment for Coleshill Mill

Date: November 2018

For: National Trust

Type: History and management options

Cole

The RRC were asked by the National Trust to provide a management options assessment for Coleshill Mill, Wiltshire. A leat was constructed to provide water to the mill and in the 1990s, restoration of the natural river course took place to divert the majority of flow away from the mill building to protect it from flooding. Now, the mill is used for demonstrations, but staff have found that operation of the mill has become increasingly difficult due to a reduction of flow. 

The RRC assessment included a walkover of the site with other stakeholders to identify problems areas. Problems identified include cattle poaching, leakage of sluices and earth banks, and sediment/ vegetation accumulation reducing river channel capacity. A management report was compiled which contained a breakdown of the problem areas with short-, medium- and long-term action points that were assigned a cost value and priority band. Management options suggestions included: 

  • Plugging leaks in the leat
  • Cattle fencing to establish a riparian barrier
  • Repairing significant structures and removing structures with little value to mill functioning
  • Riparian planting and floodplain reconnection